gareth harris
Sustaining Member
A couple of years ago, we had a thread on building a locker in an E35. Has anyone completed it yet?
My first thought is whether a horizontal or vertical mount would work best, since it would be much easier to build the locker with the tank already in hand, and I wonder what to buy.
And then location, either in the aft locker, or under the cockpit floor next to the rudder shaft.
And finally, venting. A few years ago somebody (Glyn, was it you?) suggested the idea of making a vent inside one of the poles of the stern rail. Are there any numbers to go with that, such as the size of the holes in the side of the pole?
Gareth
Freyja E35 #241 1972
My first thought is whether a horizontal or vertical mount would work best, since it would be much easier to build the locker with the tank already in hand, and I wonder what to buy.
And then location, either in the aft locker, or under the cockpit floor next to the rudder shaft.
And finally, venting. A few years ago somebody (Glyn, was it you?) suggested the idea of making a vent inside one of the poles of the stern rail. Are there any numbers to go with that, such as the size of the holes in the side of the pole?
Gareth
Freyja E35 #241 1972