E35-II RePower Update

chaco

Member III
Here are some pics on the Engine Stringer progress on the Beta 902
Repower. This is (4) layers of Epoxy / 23oz double bias fabric.
(4) more layers to go for 3/8" to 1/2" structural thickness :p
The engine mounts will be fastened to 3/8" x 3"x 22" SS Bar Stock.
The Bar Stock will be attached to the Stringers with thru bolts,
Epoxy/High Density Filler and glassed in.
Would appreciate a look-see and comments from the RePower Gang :D

Happy Auxilliary :egrin: :egrin:
 

Attachments

  • 102_0228.JPG
    102_0228.JPG
    92.3 KB · Views: 116
  • 102_0250.JPG
    102_0250.JPG
    70.8 KB · Views: 107
  • 102_0251.JPG
    102_0251.JPG
    67.4 KB · Views: 126
Top