Jeff Asbury
Principal Partner
Cabrillo Way Marina (Westrec Marinas)
Thought some of you Port of LA folks might be interested in how the 700 new slips will be constructed, as well as all the other facilities that are coming. This will really change the way I come back into Cabrillo Marina. Gonna have to drop the rags right in the middle of Hurricane Gulch in the future. I have no idea when this will all be completed. Looks like phase 1 of 3 is almost done. Locals are calling this "Marina del Pedro".
The black slips indicate the new ones overlaid on a photo of the existing West Channel.
http://www.portoflosangeles.org/facilities/cabrillomarina.asp
"Cabrillo Way Marina is located south of 22nd Street and Miner Street on the easterly side of the West Channel and covers 46 acres of land and 41 acres of water. Improvements include 700 wet slips and 400 mast up storage spaces. Also included are floating docks with boat slips, boater restrooms and shower facilities, public restrooms, boater and public parking lots, and a public hoist and launching facility. Construction includes dredging and fill, rock dikes, reinforced concrete* piling, floating docks, earthwork, concrete work, grading and paving, utilities, temporary buildings, lighting, landscaping, and promenade.*"
Thought some of you Port of LA folks might be interested in how the 700 new slips will be constructed, as well as all the other facilities that are coming. This will really change the way I come back into Cabrillo Marina. Gonna have to drop the rags right in the middle of Hurricane Gulch in the future. I have no idea when this will all be completed. Looks like phase 1 of 3 is almost done. Locals are calling this "Marina del Pedro".
The black slips indicate the new ones overlaid on a photo of the existing West Channel.
http://www.portoflosangeles.org/facilities/cabrillomarina.asp
"Cabrillo Way Marina is located south of 22nd Street and Miner Street on the easterly side of the West Channel and covers 46 acres of land and 41 acres of water. Improvements include 700 wet slips and 400 mast up storage spaces. Also included are floating docks with boat slips, boater restrooms and shower facilities, public restrooms, boater and public parking lots, and a public hoist and launching facility. Construction includes dredging and fill, rock dikes, reinforced concrete* piling, floating docks, earthwork, concrete work, grading and paving, utilities, temporary buildings, lighting, landscaping, and promenade.*"
Attachments
Last edited: