Page 2 of 2 FirstFirst 12
Results 16 to 17 of 17

Thread: Hand rail rebedding on Ericson 29

  1. #16
    Principal Partner Randy Rutledge's Avatar
    Join Date
    Jun 2005
    Location
    Tallapoosa, Ga
    Posts
    806
    Tenders
    Look at the handrail section of the E-29 owner’s manual on this site I have attached the page 68. The inner and outer on port are the same length the Starboard is two grips short as it ends at the bulkhead the table is mounted on.
    The handrail on the inside just bolted against the surface of the headliner. The inside handrails are nice if you sail in any rough water. If you need pictures I can take a few next weekend if I get to the boat.
    Attached Images Attached Images
    Randy R
    78 E-29 T Hull# 591 Rumkin
    76 E-29 T Hull# 447 GittinAir

  2. #17
    Innocent Bystander tenders's Avatar
    Join Date
    Jun 2006
    Location
    Harlem Yacht Club, City Island, NY
    Posts
    1,105
    Helpful. Thank you Randy.

Similar Threads

  1. Teak grab rail rebedding
    By John Wressell in forum Maintenance & Mechanical
    Replies: 14
    Last Post: 07-04-2011, 06:26 AM
  2. Another hand rail thread...E30+
    By mherrcat in forum Maintenance & Mechanical
    Replies: 2
    Last Post: 09-15-2008, 04:55 PM
  3. Left Hand vs Right Hand
    By hathanger in forum Design & Function
    Replies: 7
    Last Post: 11-16-2007, 08:06 PM
  4. Rebedding Rub Rail 89' E 38-200
    By ted_reshetiloff in forum Maintenance & Mechanical
    Replies: 7
    Last Post: 03-15-2005, 09:58 AM
  5. hand rail/grab rail
    By gareth harris in forum Maintenance & Mechanical
    Replies: 4
    Last Post: 03-01-2003, 12:54 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •