Floor frames were carefully measured and cut to float a cm off of the hull, glassed on both sides and epoxy sealed edges, then tabbed into place with 3 layers of 17 oz tabbing. A large 3/8" G-10 backing plate, big enough for the two cooling-water thruhulls & valves, was also glassed in at this time as the tabbing for the floors overlapped with it. This location will be under the galley extension/sink area, which should provide quick and easy access through a cabinet door. I never...
-
24047.jpg
171.4 KB · Views: 1,321
-
24044.jpg
139.4 KB · Views: 198
-
24045.jpg
194.3 KB · Views: 207
-
24046.jpg
169.7 KB · Views: 192
-
24048.jpg
71.5 KB · Views: 256