Recent content by kdr

  1. K

    35-2 Traveller

    I have 1977 Ericson 35-2. I would like to move the traveller from the cockpit to just forward of the Main Hatch. I had planned on using the Gaurhauer traveller system with thier stand off brackets. With proper backing plates, do you think that the cabin top structure can support the traveller...
  2. K

    35-2 hatch

    I need to rebuild my main hatch on my 77 35-2. Would anyone be kind enough to send me some digital shots of what the original looked like Thanks Krocha@smithwick-ins.com
  3. K

    35-2 portlights

    I would like to replace all my portlights, including the larger angled rectangular back aft. Has anyone found a product line with similar dimensions. krocha@smithwick-ins.com
  4. K

    35-2 hatch

    I need to fabricate a new main hatch, the one that came with the boat is not original. Does anyone have plans, drawings, pictures, etc, of the original that they can forward. I can reciprocate with diesel installation, hot water, rudder mod, bulkhead renewal, info
  5. K

    35-2 portlights

    has anyone replaced the 4 trapazoidal portlights on 35-2.
  6. K

    35-2 strut

    While I was being hauled last year, the lifting strap was on the shaft slightly bending the strut. I would like to heat it and attempt to tweak with a large pipe wrench. I am wondering about the structural integrity of the strut. Has anyone had a reason to remove/replace/straighten. thanks
  7. K

    35-2 rudder modification

    I would like to increase the size of my rudder. Foss Foam recommends either the ericson 38, or the cal 40. all comments greatly appreciated.
  8. K

    35-2 water heater

    Has anybody added a hot water heater to the 35-2. If so where did you place it. thank you
  9. K

    35-2 rudder

    Looking for information on the much talked about rudder modification for the 35-2. Any an all info appreciated
  10. K

    35-2 engine replacement

    I am replacing my a 4 with yanmar 3 gm. My engine is located in the salon. Has anyone done this replacement before, particularlly interested in installation of new stringers.
Top